ABB ACS 400 User Manual page 12

Frequency converter from 2.2 to 37 kw
Hide thumbs Also See for ACS 400:
Table of Contents

Advertisement

1
2
3
4
5
6
7
8
9
10
11
12
Figure 1
Step by step instructions for installing the ACS 400. The references after each step refer
to one or more of the Reference Sections on the following pages in this User's Manual.
2
CHECK the environment.
MOUNT the ACS 400 on the wall.
REMOVE the cover.
ATTACH a warning sticker
in the language of your choice.
IDENTIFY power and control terminals.
CHECK voltage supply and fuses.
CHECK the motor.
CHECK I/O jumpers J1 and J2.
CONNECT power terminals.
CONNECT control wires.
REPLACE the cover.
TURN the power on.
See A
See B, C
See D
See E, F
See E,H, I
See G,S
See K, S
See E, J, L
See E, H, I
See E, H, I,
J, L
See M
See N
ACS 400 User's Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents