Connecting Ac Mains; Connecting Batteries - Texecom Premier 24 Installation Manual

Texecom premier 24 installation manual
Hide thumbs Also See for Premier 24:
Table of Contents

Advertisement

Installation

Connecting AC Mains

The AC Mains supply is connected to a 3 way 'Euro Type'
fused terminal block, which is fitted with a 125mA or 500mA
fuse.
!
All other wiring MUST be carried out before AC mains
is connected to the control panel.
After connecting the AC Mains, fit the mains cover,
this can be found in the spares bag.
To transformer
12

Connecting Batteries

If installing to PD6662: 2004 then only One 12V 7Ah battery
or 12V 17Ah battery can be fitted inside the control panel to
provide continued operation in the event of an AC mains
failure, otherwise, two 12V 7Ah batteries can be connected.
!
All other wiring MUST be carried out before the
battery is connected to the control panel.
Connect the red battery lead to the positive terminal of the
battery and then connect the black battery lead to the
negative terminal.
!
L
The panel will only become 'live' when the AC Mains
is connected or the 'Battery Kick-start' button is
E
pressed.
N
+
12V 17Ah Battery
-
+
12V 7Ah Battery
-
If not installing to PD6662: 2004
+
12V 7Ah Battery
-
+
12V 7Ah Battery
-
!
Two batteries can be fitted and still comply with
PD6662:2004 if the Premier Battery Splitter is used.
Premier 24 Installation Manual
OR
OR
+
Battery
_
+
Battery
_
+
Battery
_
INS248

Advertisement

Table of Contents
loading

Table of Contents