Glove Box Installation; Digital Clock Removal; Digital Clock Installation - Daewoo Nubira Owner's Manual

1998-2001 nubira
Hide thumbs Also See for Nubira:
Table of Contents

Advertisement

9E – 28IINSTRUMENT/DRIVER INFORMATION
Installation Procedure
1.
Position the glove box in the instrument panel.
2.
Install the glove box with the screws.
Tighten
Tighten the glove box screws to 5.5 NSm (49 lb–in).
DIGITAL CLOCK
Removal Procedure
1.
Disconnect the negative battery cable.
2.
Remove the plastic cover to reveal the screws.
3.
Remove the screws and the digital clock.
4.
Disconnect the electrical connector.
Installation Procedure
1.
Connect the electrical connector.
2.
Install the digital clock with the screws.
Tighten
Tighten the digital clock screws to 4 NSm (35 lb–in).
3.
Install the cluster housing.
4.
Connect the negative battery cable.
DAEWOO V–121 BL4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents