UPS Initial Startup

To start up the UPS:
NOTE Verify that the total equipment ratings do not exceed the UPS capacity to prevent an
overload alarm.
1.
2.
3.
4.
5.
6.
7.
8.
Avaya 9130 1000–3000 VA UPS Site Preparation, Installation and Operator's Manual
Replace the EBM front cover.
To replace the cover, verify that the EBM cables are routed through
the EBM cover knockouts, then slide the cover from the left to the
right until it connects with the cover hook near the left side of the
EBM cabinet. Reinstall the two screws on the right side of the front
cover. For reference, see Figure 11 on page 27.
Repeat for each additional EBM.
Verify that all wiring connecting the UPS and EBM(s) is installed
behind the front covers and is inaccessible to users.
Return to Step 4 on page 25 to continue the UPS installation.
Verify that the internal batteries are connected. See "Installing the
UPS" on page 23.
If optional EBMs are installed, verify that the EBMs are connected
to the UPS. See "Connecting the EBM(s)" on page 26.
Plug the equipment to be protected into the UPS, but do not turn
on the protected equipment.
Make any necessary provisions for cord retention and strain relief.
Models without an attached power cord. Plug the detachable UPS
power cord into the input connector on the UPS rear panel.
Plug the UPS power cord into a power outlet.
The UPS front panel display illuminates and shows a status of "UPS
initializing..."
Verify that the UPS transfers to Standby mode ("UPS on standby").
Press the
button on the UPS front panel for at least one second.
The UPS front panel display changes status to "UPS starting..."
INSTALLATION
S
29
164201765 Rev 1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents