INSTALLATION
Connecting the UPS Internal Battery
To ensure proper battery operation:
1.
2.
3.
4.
22
Avaya 9135 6000 VA UPS Site Preparation, Installation and Operator's Manual
Verify that the UPS is off and unplugged.
Remove the two screws from the battery switch (see Figure 2).
Battery Switch
Figure 2. Removing the Battery Switch Screws
Slide the battery connector so that you can read Connected (see
Figure 3).
Reinstall the two screws removed in Step 2.
Figure 3. Connecting the Internal Battery Connector
Two
Screws
S
164201769 Rev 1