Installation; Inspecting The Equipment - Avaya 9130 Installation And Operator's Manual

1000–3000 va uninterruptible power systems
Table of Contents

Advertisement

Chapter 3

Inspecting the Equipment

Avaya 9130 1000–3000 VA UPS Site Preparation, Installation and Operator's Manual

Installation

This section explains:
S
Equipment inspection
S
Unpacking the cabinet
S
Checking the accessory kit
S
Cabinet installation
S
Wiring installation
S
Initial startup
If any equipment has been damaged during shipment, keep the shipping
cartons and packing materials for the carrier or place of purchase and file
a claim for shipping damage. If you discover damage after acceptance,
file a claim for concealed damage.
NOTE Check the battery recharge date on the shipping carton label. If the date has passed
and the batteries were never recharged, do not use the UPS. Contact your Avaya service
representative.
S
164201765 Rev 1
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents