NEC Express5800 User Manual page 282

Hide thumbs Also See for Express5800:
Table of Contents

Advertisement

9-26 Upgrading Your Server
8.
Install the PCI retention springs removed in step 5.
9.
Push the tabs of the PCI board retention springs one by one to make them contact with the
rear of the server.
A click occurs to lock each of the tabs.
10.
Assemble the server.
11.
Turn on the power of the server. Make sure that no error message appears in the POST.
If an error message appears, write down the message and contact your maintenance
service representative for the maintenance.
Insert claw.
Insert claw.

Advertisement

Table of Contents
loading

Table of Contents