CET-16 Service Manual
Page 21
Final Setup And Checkout
This is a simple test procedure to verify that the electrical, water, and
drain lines have been property connected to the SteamCraft V. The test
also verifies basic operation of the steamer. For a more complete test of
the SteamCraft V functions, perform the Function Test on page 23.
Setup
1. Refer to Assembly (page 14) and verify that racks, guard, and cover
are properly positioned in the steamer compartment.
2. Refer to figure 2-21, and dose the drain valve (handle points toward
right side of the unit).
Printed 4/90