LOG SET INSTALLATION
STEP 2: #2 & #3 LOG PLACEMENT
#3
#2
Place left side alignment hole on base log #2 and right side alignment hole on base log #3 over pins on front log
brackets, positioning cut-outs on logs over log grate. Press logs down onto pins.
STEP 3: #11, #12 & #6 LOG PLACEMENT
#11
#12
#6
Position #11, #12, and #6 logs onto corresponding cut-outs / notches on base logs. The #6 log must not extend over front of #2 log.
PAGE 33