Section 2. Installation
Basic Setup Procedure
See
information in this section. Use the procedure as a quick reference if you are familiar
with the installation requirements for the power supply. If you want more
information, each step in the procedure refers to sections which contain more details.
Execute each step in the sequence given.
Table 2.1 Basic Setup Procedure
Step #
1
2
3
4
5
6
Revision A
Table 2.1
for a summary of the basic setup procedure and an overall view of the
Description
Action
Inspection
Perform an initial physical
inspection of the supply.
Installation
Install the supply (bench or rack
mount); ensure adequate
ventilation.
Input Power
Connect AC input power.
Test
Perform functional tests for voltage
mode operation, current mode
operation, and front panel controls.
Load
Connect the load.
Sensing
Connect sensing lines.
Reference
"Initial Inspection" on
page 32
"Location, Mounting,
and Ventilation" on
page 35
"AC Input Power" on
page 36
"Functional Tests" on
page 37
"Load Connection" on
page 39
"Local and Remote
Sensing" on page 48
31