4-10 Compaq ProLiant DL380 Generation 2 Server Setup and Installation Guide
WARNING: To reduce the risk of personal injury, be careful when pressing the
server rail-release latches and sliding the component into the rack. The sliding
rails could pinch your fingertips.
CAUTION: Be sure to keep the server parallel to the floor when sliding the
server rails into the slide rails. Tilting the server up or down could result in
damage to the rails.
4. Press the server rail-release latches inward on both sides of the server.
Figure 4-10. Pressing the server rail-release latches
IMPORTANT: The first time you slide the server into the rack, you may have to apply
some pressure. With continued use, the ball bearings in the slide move easily.
5. Slide the server fully into the rack.
6. Slide the server out and back into the rack to ensure the rails are
functioning properly.