Compaq ProLiant DL380 - G2 Server Setup And Installation Manual page 70

Compaq proliant dl380 generation 2 setup and installation guide
Hide thumbs Also See for ProLiant DL380 - G2 Server:
Table of Contents

Advertisement

3-34 Compaq ProLiant DL380 Generation 2 Server Setup and Installation Guide
To install a redundant hot-plug power supply:
1. Remove the power supply blank:
a. Press the locking lever
b. Pull the blank out of the bay
Figure 3-30. Removing a power supply blank
NOTE: Store the power supply blank for future use.
2. Remove the protective cover from the connector pins on the redundant
power supply.
Figure 3-31. Removing protective cover from power supply connector pins
.

.

2
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant dl380 generation 2

Table of Contents