Compaq ProLiant DL380 - G2 Server Setup And Installation Manual page 84

Compaq proliant dl380 generation 2 setup and installation guide
Hide thumbs Also See for ProLiant DL380 - G2 Server:
Table of Contents

Advertisement

Use the rack template to identify the required space and location for your
server:
1. Identify the front side of the template.
2. Starting at the bottom of the rack, or at the top of a previously mounted
component, secure the template against the front of the rack by pressing
the two push tabs. Match the hole pattern on the template with the holes
on the vertical rails of the rack.
Figure 4-1. Measuring with the template
Installing the Server 4-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant dl380 generation 2

Table of Contents