Compaq ProLiant DL380 - G2 Server Setup And Installation Manual page 207

Compaq proliant dl380 generation 2 setup and installation guide
Hide thumbs Also See for ProLiant DL380 - G2 Server:
Table of Contents

Advertisement

5. Install the new battery.
Figure G-3. Installing the new battery
6. Install the access panel. See the "Installing the Access Panel" section in
Chapter 3, "Installing Hardware Options."
7. Reconnect the power cord and peripheral devices. See the "Connecting
the Power Cord and Peripheral Devices" section in Chapter 4,
"Installing the Server."
8. Power up the server. See the "Powering Up the Server" section in
Chapter 4, "Installing the Server."
9. Run RBSU to reconfigure the system with the new battery. See
Chapter 7, "Server Configuration and Utilities."
System Battery G-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant dl380 generation 2

Table of Contents