Length Of The Spur Line Of The Programmer Connection As A Function Of The 3-10 4-1 Spacing Between Dp/Asi Link And Cable Duct - Siemens SIMATIC Distributed I/O System DP/ASi Link Manual

Table of Contents

Advertisement

Configuration Options
Rule for
Both the 2-core cable and the 5-core cable can be connected to the program-
connection of
mer connector.
programmer
A programmer connector may be placed anywhere on the PROFIBUS-DP
connector
field bus. When doing so, pay attention to the following:
Table 3-3
< 500 kBd
1500 kBd
> 1500 kBd
3-10
Since a terminating resistor cannot be inserted, the programmer connector
must not be located at the ends of the bus line.
You may place several programmer connectors on the bus. However, you
may connect only one programmer to one of the programmer connectors
on the bus, since the programmer represents a node having the station
number 0.
For connecting a programmer, the following values apply to the length of
the spur line as a function of the baud rate on the PROFIBUS-DP bus:
Length of the spur line of the programmer connection as a function of
the baud rate on the PROFIBUS-DP bus
Baud Rate
Max. Length of Spur Line
Max. 32
3 m
Max. 10
5 m
Max. 1
10 m
Max. 5
2 m
(3 m spacing)
or
PROFIBUS bus terminal
Max. 1
1.5 m
Distributed I/O System DP/ASi Link
EWA 4NEB 710 6055-02b

Advertisement

Table of Contents
loading

Table of Contents