Fluke 5520A Service Manual page 252

Multi-product calibrator
Hide thumbs Also See for 5520A:
Table of Contents

Advertisement

5520A
Service Manual
—E—
Edge Duty Cycle function
Verification, 6-36, 6-92
Edge Frequency function
Verification, 6-35, 6-91
Edge function
Rise time verification, 6-36, 6-92
Theory of Operation, 6-12, 6-71
Edge Function
Specifications, 6-7, 6-67
Trigger Specifications, 6-11
Encoder assembly (A2)
Theory, 2-4
Equipment required for calibration and verification,
3-3
Error messages
Non diagnostic, 4-8
SC Option not installed, 6-5, 6-65
—F—
frequency
specifications, 1-23
Frequency
Verification, 3-56
—H—
Hardware adjustments for SC300, 6-107
Hardware adjustments for SC600, 6-57
harmonics (2nd - 50th) specifications, 1-24
—L—
Leveled Sine Wave function
adjusting the harmonics, 6-58
adjusting VCO balance, 6-58
Amplitude Verification, 6-39, 6-95
equipment setup, 6-23, 6-80
Flatness Verification
High frequency, 6-25, 6-82
High frequency at 5.5 V, 6-46, 6-101
Low frequency, 6-24, 6-82
Low frequency at 5.5 V, 6-46, 6-101
Low frequency equipment setup, 6-40, 6-44,
6-95, 6-99
Frequency Verification, 6-41, 6-96
Harmonics Verification, 6-42, 6-97
Theory of Operation, 6-12, 6-71
Leveled Sine Wave Function
Specifications, 6-8, 6-68
local operation, 1-4
—M—
Main CPU assembly (A9)
Theory, 2-8
MeasZ Capacitance
Verification, 6-55
2
MeasZ function
Calibration, 6-26
MeasZ Function
Capacitance Specifications, 6-11
Resistance Specifications, 6-11
MeasZ Resistance
Verification, 6-54
—O—
operation overview, 1-4
Overload function
Verification, 6-56
Overload Function
Specifications, 6-12
—P—
Parts, how to obtain, 5-3
Performance verification. See Verification
phase
specifications, 1-21
Phase Accuracy, Volts and AUX Volts
Verification, 3-54
Phase Accuracy, Volts and Current
Verification, 3-55
power and dual output limit specifications, 1-20
Power supplies, 2-8
Inguard supplies, 2-8
Outguard supplies, 2-8
power uncertainty, calculating, 1-22
Pulse Function
Trigger Specifications, 6-10
Pulse Generator Function
Specifications, 6-10
Pulse period verification, 6-54
Pulse Width function
Calibration, 6-25
equipment setup, 6-25
Verification
equipment setup, 6-53
Pulse width verification, 6-53
—R—
remote commands, 3-28
remote operation (IEEE-488), 1-4
remote operation (RS-232), 1-4
Removing
Analog modules, 4-3
Rear panel assemblies, 4-4
The Encoder (A2) and Display PCAs, 4-4
The Filter PCA (A12), 4-4
The Keyboard and Accessing the Output Block,
4-4
The Main CPU (A9), 4-3
Reports, calibration, 3-34

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents