Installing and Configuring the Director 2/64
Figure 28: Positioning the sliding shelf bracket at the rack front
Recommended Cable Management
Perform the following procedure after installing a switch, as shown in
1. Install two cable restraints (1) on each side of the rack in positions that will
2. Form loose bundles of the installed Fibre Channel cables (2) on each side of
3. Wrap the cable bundles with the cable restraints (1) in two positions on each
70
hold the Fibre Channel cables away from the power supply.
the rack.
side of the rack to maintain clearance for power supply access (3).
Figure
Director 2/64 Installation Guide
29: