Figure 29: Recommended cable management
Power-On Self Test
Use the following steps to run a Power-On Self Test (POST):
1. Power on the PDUs (if used).
2. At the bottom rear of the director, set the power switch (circuit breaker) to the
Director 2/64 Installation Guide
Up position.
The director powers on. The following occurs during POST:
Amber LEDs on both CTP2 cards and all universal port module (UPM)
cards illuminate momentarily.
The green LED on each CTP2 card (active and backup) turns O
card is tested and UPM cards are tested.
Green LEDs associated with Fibre Channel ports sequentially illuminate
as the ports are tested.
Installing and Configuring the Director 2/64
as the
N
71