Prepare The Switch For Installation - HP Surestore 64 - Director Switch Installation Manual

Fw 05.01.00 and sw 07.01.00 director 2/64 installation guide (aa-rsngc-te/958-000289-001, june 2003)
Hide thumbs Also See for Surestore 64 - Director Switch:
Table of Contents

Advertisement

3. Locate the square opening in the rail that corresponds with the appropriate
4. Position the higher, shelf bracket threaded hole in this square opening, as
5. Orient the shelf bracket in the rails.
6. Place the square washer provided on the front of the rail so that the two bumps
7. Insert the panhead Phillips screw, and partially tighten to temporarily stabilize
8. Make sure the shelf bracket is level, and align the rear of the shelf bracket
9. Repeat
10. Repeat
11. Completely tighten all screws attaching shelf brackets to the rack's rails.
12. Using a torque driver, torque the screws to 22 in/lb.

Prepare the Switch for Installation

The following section describes how to install the mounting hardware that
attaches the switch to the rails. This hardware includes:
Director 2/64 Installation Guide
marker hole, as shown in
shown in
Figure
10.
on the washer sit in opposite corners in the rail's square hole.
the bracket.
with the appropriate position on the rear rail, as shown in
step 4
through
step 1
through
Two front mounting brackets
Two rear mounting plates
Ten cage nuts
Eight screws
Installing and Configuring the Director 2/64
Figure
10.
step 7
for the rear end of the shelf bracket.
step 9
for the second shelf bracket.
Figure
10.
51

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storageworks director 2/64

Table of Contents