HP Surestore 64 - Director Switch Installation Manual page 66

Fw 05.01.00 and sw 07.01.00 director 2/64 installation guide (aa-rsngc-te/958-000289-001, june 2003)
Hide thumbs Also See for Surestore 64 - Director Switch:
Table of Contents

Advertisement

Installing and Configuring the Director 2/64
2. Mount the switch in the rack, as shown in
Figure 24: Securing the switch to the rack
66
a. On one side at the back of the switch, position an angle bracket (2) so
that the threaded holes (1) are against the slots (5) of the rear mounting
bracket and the angled side face out.
b. Insert the screws (6) through the rear mounting bracket slots into the
threaded nuts of the angle bracket.
c. Insert a second set of screws (4) through the angle bracket and the rail
column into the sheet metal nuts on the back rail (3).
d. Repeat
step a
through
e. At the front of the rack, insert the screws through the front mounting
brackets into the sheet metal nuts installed in the rail columns in
"Prepare the Front and Rear Rack
f.
Tighten all screws.
Figure
step c
for the other side at the back of the switch.
Columns" on page 62.
24:
step 1
Director 2/64 Installation Guide
of

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storageworks director 2/64

Table of Contents