NAP 200-006
Sheet 4/7
Cable Running to the MDF
(2) When using the cable hole of the PIM
(a) Make the cable hole on the left side of PIM as shown in
(b) Bring the MDF cable up to the PIM0 through the cable hole (s) of the BASE and bring the MDF cable
up to the other PIM through the cable hole (left side) of each PIM.
(c) Connect the champ connector of each MDF cable to an LTC connector located on a PIM using the
screws provided, as shwon in
(d) Pare the sheath of each MDF cable and secure the shield to the front bracket on the PIM using tie
wraps, as shown in
CHAPTER 3
Page 82
Revision 2.0
Cut off the plate.

Figure 006-3 Making Cable Hole on the PIM

Figure
Figure
006-4.
Figure
File the projections.
006-4.
ND-45492 (E)
006-3.
Put in the edgings.