2. PROCEDURE
This section explains the procedures for installing the NEAX2000 IVS system. The installer should follow the
procedure shown in the following flowchart. In the flowchart, a NAP number is denoted to the right side of each
step. The NAP Number refers to the details for each procedure.
CHAPTER 3
Page 16
Revision 2.0
START
UNPACKING
MARKING AND DRILLING
INSTALLATION
OF
MAIN EQUIPMENT
INSTALLATION
OF
PERIPHERAL EQUIPMENT
CONNECTION
OF
BATTERY
CABLE RUNNING
TO THE MDF
TERMINATION OF
CABLES ON THE MDF
SWITCH SETTING