Figure 003-5 Connection Of The Pim And The Rack Parts - NEC NEAX 2000 IVS Installation Manual

Hide thumbs Also See for NEAX 2000 IVS:
Table of Contents

Advertisement

NAP 200-003
Sheet 5/37
Installation of Main Equipment
(4) Secure the PIM to the RACK PARTS as shown in
in the RACK PARTS. When the system is a multiple-PIM configuration, secure all PIMs and RACK
PARTS.
REAR

Figure 003-5 Connection of the PIM and the RACK PARTS

Figure 003-5
by tightening the 4 screws already mounted
BASE
Note:
ND-45492 (E)
PIM
The Battery Module (BATM) and/or
the MDF Module (MDFM) can be in-
stalled in the same manner as the PIM.
CHAPTER 3
Page 27
Revision 2.0

Advertisement

Table of Contents
loading

Table of Contents