Figure 003-2 Connection Of Rack Parts; Nap - NEC NEAX 2000 IVS Installation Manual

Hide thumbs Also See for NEAX 2000 IVS:
Table of Contents

Advertisement

NAP 200-003

Sheet 2/37
Installation of Main Equipment
(2) In a Multiple-PIM Configuration
(a) When the system is a multiple-PIM configuration, connect the RACK PARTS to each other as shown
in
Figure
RACK PARTS
CHAPTER 3
Page 24
Revision 2.0
003-2.
REAR

Figure 003-2 Connection of RACK PARTS

RACK PARTS
BASE
ND-45492 (E)