(1) Connect the battery cables to the batteries, and mount the battery units (24 V DC, 24AH per unit) into the
Battery Module (BATTM) as shown in
BATTERY CABLE
FRONT
Recommended Batteries
Yuasa NP-24-12B
Matsushita LCL-12V-24
Specifications
UL Listed
12VDC, 24AH
Terminal: bolt/nut type with hole for 5mm bolt
Dimensions:
166mm L x 175mm W x 125mm H
(6.54in L x 6.89in W x 4.92in H)
Figure
+
+
+
+

Figure 005-4 Battery Mounting into the BATTM

ND-45492 (E)
005-4.
TO PZ-PW86 IN PIM0/PIM4
BATTERY UNIT (24 V DC, 24AH)
BATTERY UNIT (24 V DC, 24AH)
A: 12mm
B: 2mm
(.472in)
(.079in)
5.5mm
(.216in)
TO PZ-PW86 IN PIM0/PIM4
BATTM
CHAPTER 3
Revision 2.0
Page 77

Advertisement

Table of Contents
loading

Table of Contents