Figure 007-42 Connection Of 25-Pair Cable And Pz-8Pfta - NEC NEAX 2000 IVS Installation Manual

Hide thumbs Also See for NEAX 2000 IVS:
Table of Contents

Advertisement

NAP 200-007
Sheet 50/56
Termination of Cables on the MDF
• Install the PZ-8PFTA card to the PIM according to the following steps.
STEP 1: Connect the champ connectors of 25-pair cables to the PFT0 and PFT1 connectors on the
TO MDF
(SEE STEP 3)
25-PAIR CABLE
PZ-8PFTA card as shown in
and tie wraps.
CHAMP CONNECTOR (PROVIDED WITH PZ-8PFTA)

Figure 007-42 Connection of 25-Pair Cable and PZ-8PFTA

Figure
007-42. Then, secure them to each other using screws
PFT0 CONNECTOR
+
+
ND-45492 (E)
PFT1 CONNECTOR
+
+
PZ-8PFTA
CHAPTER 3
Page 135
Revision 2.0

Advertisement

Table of Contents
loading

Table of Contents