Figure 003-22 Connecting The Rack Parts And The Base - NEC NEAX 2000 IVS Installation Manual

Hide thumbs Also See for NEAX 2000 IVS:
Table of Contents

Advertisement

NAP 200-003
Sheet 26/37
Installation of Main Equipment
(2) When mounting the RACK PARTS to a wall, connect all the RACK PARTS to each other, and connect the
BASE to the bottom RACK PARTS using the M5 Machine screws (provided), as shown in
BASE
CHAPTER 3
Page 48
Revision 2.0
(JOINT)
(JOINT)

Figure 003-22 Connecting the RACK PARTS and the BASE

RACK PARTS
M5 MACHINE SCREW-C
(x2/JOINT AREA)
(PROVIDED WITH RACK PARTS)
ND-45492 (E)
Figure
003-21.

Advertisement

Table of Contents
loading

Table of Contents