Figure 006-2 Cable Running To The External Mdf (1 Of 2) - NEC NEAX 2000 IVS Installation Manual

Hide thumbs Also See for NEAX 2000 IVS:
Table of Contents

Advertisement

NAP 200-006
Sheet 3/7
Cable Running to the MDF
2. Cable Running to the External MDF
(1) When not using the cable hole of the PIM
(a) Bring the MDF cable up to the Main Equipment through the cable hole(s) of the BASE.
(b) Connect the champ connector of each MDF cable to an LTC connector located on a PIM using the
screws provided, as shown in
(c) Pare the sheath of each MDF cable and secure the shield to the front bracket on the PIM using tie
wraps, as shown in
PBX
PIM1
PIM0
BASE
TO MDF
Figure
Figure
006-2.
FRONT

Figure 006-2 Cable Running to the External MDF (1 of 2)

006-2.
LTC CONNECTOR
PIM
SHIELD
TIE WRAP
ND-45492 (E)
CHAMP CONNECTOR
MDF CABLE
25 ~ 30 mm
(1.0 ~ 1.2 inch)
CHAPTER 3
Page 81
Revision 2.0

Advertisement

Table of Contents
loading

Table of Contents