NAP 200-003
Sheet 14/37
Installation of Main Equipment
(b) Secure the AC CORD-B cables to the FG, NEUTRAL and LINE terminals as shown in
12. The 3P AC Power Cable and the FG Cable are pre-installed with the BASE.
PIM
FG CABLE
(PROVIDED WITH BASE)
CHAPTER 3
Page 36
Revision 2.0
FG
BASE
AC POWER
KNOCK OUT HOLE

Figure 003-12 Screwing the AC CORD-B to the Terminals

PUSH
: INSERT THE AC CORD
PULL
: FIXED THE AC CORD
NEUTRAL
LINE
SUPPLEMENTARY GROUND
(TO COLD WATER PIPE, ETC.)
ND-45492 (E)
Figure 003-
CORD BUSH
(PROVIDED WITH BASE)
AC CORD-B
TO PZ-PW86 IN PIM
(PROVIDED WITH PIM)
TO 120/240 V AC
SOURCE POWER
3P AC POWER CABLE
(PROVIDED WITH BASE)