Introduction
1.8
Space requirements
To ensure that machine operation, consumables replenishing, part replacement, and regular maintenance
can easily be performed, adhere to the recommended space requirements detailed below.
Reminder
Be sure to allow a clearance of 100 mm (4 in.) or more at the back of this machine for the ventilation
duct.
d-Color MF550/MF450
806.5
958.3
d-Color MF550/MF450+FS-608+LU-301
2090.9
555
958.3
958.3
387
d-Color MF450+FS-519+SD-505+LU-301
387
391.9
391.9
1130
50
Unit: mm
1571.9
50
1130
1130
Unit: mm (inch)
1
1-19