Cisco AJ732A - MDS 9134 Fabric Switch Installation Manual page 94

Cisco mds 9500 series hardware installation guide (ol-17467-02, october 2008)
Hide thumbs Also See for AJ732A - Cisco MDS 9134 Fabric Switch:
Table of Contents

Advertisement

Installing the Chassis in a Cabinet or Rack
S e n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a c k - d o c @ c i s c o . c o m .
Figure 2-7
1
2
If you are installing the optional cable management bracket, place the cable management bracket in front
Step 5
of the front right rack-mount brackets. Align the holes in the cable management brackets with the holes
in the front rack-mount brackets and mounting rails, and then insert the screws.
Note
Align the holes in the front rack-mount bracket with the holes in the mounting rails and insert the 12-24
Step 6
x 3/4-inch or 10-32 x 3/4-inch screws (see
Note
Cisco MDS 9500 Series Hardware Installation Guide
2-14
Installing the Cisco MDS 9509 Chassis in the Rack
Crossbar
Mounting rail
Because the fan tray is on the left side of the chassis, Cisco recommends using only the right
side for cable management. Using the right side for cable management allows easy removal of
the fan tray if you need to replace a fan.
Use a minimum of six screws per side to ensure that the switch is adequately supported.
1
2
3
Side rack-mount bracket
Figure
2-8), using six screws per side.
Chapter 2
Installing the Cisco MDS 9500 Series
3
OL-17467-02

Advertisement

Table of Contents
loading

Table of Contents