Cisco AJ732A - MDS 9134 Fabric Switch Installation Manual page 92

Cisco mds 9500 series hardware installation guide (ol-17467-02, october 2008)
Hide thumbs Also See for AJ732A - Cisco MDS 9134 Fabric Switch:
Table of Contents

Advertisement

Installing the Chassis in a Cabinet or Rack
S e n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a c k - d o c @ c i s c o . c o m .
The rack-mount kit for the Cisco MDS 9509 Director includes side rack-mount brackets, which are
Note
required for the duration of the installation only and can be removed once the front rack-mount brackets
are securely fastened to the rack-mounting rails.
Note
The Cisco MDS 9500 Shelf Bracket Kit can be purchased as an optional shelf bracket kit for the Cisco
MDS 9509 Director. See
Table 2-2
Quantity
3 RU shelf bracket kit
6
6
2
2
1
Cable management bracket kit
2
18
18
To install the Cisco MDS 9509 chassis in a rack using the rack-mount kit provided with the switch,
follow these steps:
Position one of the side rack-mount brackets in the rack as shown in
Step 1
rack-mount bracket to the rack using three of the 12-24 x 3/4-inch or 10-32 x 3/4-inch screws, depending
on the type of holes in the mounting rails.
Repeat for the second side rack-mount bracket, ensuring that the side rack-mount brackets are at the
Step 2
same height.
Cisco MDS 9500 Series Hardware Installation Guide
2-12
"Cisco MDS 9500 Shelf Bracket" section on page
Contents of Cisco MDS 9509 Rack-Mount Kit
Part Description
12-24 x 3/4-inch Phillips binder-head screws
10-32 x 3/4-inch Phillips binder-head screws
M3 x 8-mm Phillips pan-head screws
Side rack-mount brackets
Crossbar bracket
Cable management brackets
12-24 x 3/4-inch Phillips binder-head screws
10-32 x 3/4-inch Phillips binder-head screws
Chapter 2
Installing the Cisco MDS 9500 Series
C-13.
Figure
2-5. Secure the side
OL-17467-02

Advertisement

Table of Contents
loading

Table of Contents