Appendix F
Site Planning and Maintenance Records
S e n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a c k - d o c @ c i s c o . c o m .
Table F-1
Task No. Planning Activity
5
6
1. Verify that each power supply installed in the chassis has a dedicated AC source or DC source circuit.
2. UPS = uninterruptible power supply
3. EMI = electromagnetic interference
4. RFI = radio frequency interference
OL-17467-02
Site Planning Checklist (continued)
Cable and interface equipment
evaluation:
Cable type
•
Connector type
•
Cable distance limitations
•
Interface equipment
•
(transceivers)
3
EMI
evaluation:
Distance limitations for
•
signaling
Site wiring
•
4
RFI
levels
•
Verified By
Time
Cisco MDS 9500 Series Hardware Installation Guide
Site Preparation Checklist
Date
F-5