Installing The Hot-Plug Redundant Power Supply - Compaq ML350 - ProLiant - G2 Setup And Installation Manual

Compaq proliant ml350 generation 2 server setup and installation guide
Hide thumbs Also See for ML350 - ProLiant - G2:
Table of Contents

Advertisement

3-40 Compaq ProLiant ML350 Generation 2 Server Setup and Installation Guide
Installing the Hot-Plug Redundant Power
Supply
To install the hot-plug redundant power supply:
WARNING: To reduce the risk of personal injury or damage to the equipment,
the installation of power supplies should be performed only by individuals who
are qualified in servicing server equipment and trained to deal with products
capable of producing hazardous energy levels.
WARNING: To reduce the risk of personal injury from hot surfaces, observe the
thermal labels on each power supply or module.
WARNING: To reduce the risk of injury from electric shock hazards, do not
open power supplies. Refer all maintenance, upgrades, and servicing to
qualified personnel.
CAUTION: Electrostatic discharge (ESD) can damage electronic components.
Make sure that you are properly grounded (earthed) before beginning any
installation procedure.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml350 g2

Table of Contents