Compaq ML350 - ProLiant - G2 Setup And Installation Manual page 80

Compaq proliant ml350 generation 2 server setup and installation guide
Hide thumbs Also See for ML350 - ProLiant - G2:
Table of Contents

Advertisement

Figure 3-38. Identifying the redundant power supply bay
1. Identify the redundant power supply bay at the back of the server.
IMPORTANT: Power supplies of the ProLiant ML350 Generation 2 server are hot-
pluggable. When using the redundant power supply option, it is not necessary to power
down the server before removing or installing a power supply.
2. Remove the thumbscrew that secures the redundant power supply blank,
and then lift the blank from the back of the server.
WARNING: To reduce the risk of electric shock or damage to the equipment, do
not connect AC power cords to uninstalled power supplies.
3. Slide the power supply into the power supply bay, and then apply
pressure to the power supply until the release/lock lever clicks the power
supply securely into the bay.
4. Connect the AC power cord to the power supply.
5. Verify that the power supply and the redundant power supply LEDs are
green. See Appendix E, "LED Indicators, Switches, and Jumpers," for
details.
Hardware Options Installation 3-41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml350 g2

Table of Contents