Installation Sequence - Compaq ML350 - ProLiant - G2 Setup And Installation Manual

Compaq proliant ml350 generation 2 server setup and installation guide
Hide thumbs Also See for ML350 - ProLiant - G2:
Table of Contents

Advertisement

2-6 Compaq ProLiant ML350 Generation 2 Server Setup and Installation Guide

Installation Sequence

Observe the following statements before beginning any installation
procedures.
WARNING: To reduce the risk of electric shock or damage to the equipment:
I
Do not disable the power cord grounding plug. The grounding plug is an
important safety feature.
I
Plug the power cord into a grounded (earthed) electrical outlet that is
easily accessible at all times.
I
Disconnect power from the server by unplugging the power cord from
either the electrical outlet or the server.
I
Do not place anything on power cords or cables. Arrange them so that no
one can accidentally step on or trip over them. Do not pull on a cord or
cable. When unplugging from the electrical outlet, grasp the cord by
the plug.
CAUTION: If your server has a preinstalled operating system, prevent data loss
by configuring the server using the instructions in the following section,
"Factory-Installed Operating Systems." If the operating system was not
preinstalled, follow the instructions in the "Operating System Purchased
Separately" section later in this chapter.
CAUTION: Before powering up the server, make sure that the power cord and
all cables have been properly connected or server data could be lost.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml350 g2

Table of Contents