Compaq ML350 - ProLiant - G2 Setup And Installation Manual page 47

Compaq proliant ml350 generation 2 server setup and installation guide
Hide thumbs Also See for ML350 - ProLiant - G2:
Table of Contents

Advertisement

3-8 Compaq ProLiant ML350 Generation 2 Server Setup and Installation Guide
3. Loosen the two thumbscrews located at the top of the front chassis
.
4. Slide the access panel back about 1.5 cm (0.5 in)
.
5. Lift and remove the panel.
2
1
Figure 3-6. Removing the access panel (rack server)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml350 g2

Table of Contents