Compaq ML350 - ProLiant - G2 Setup And Installation Manual page 71

Compaq proliant ml350 generation 2 server setup and installation guide
Hide thumbs Also See for ML350 - ProLiant - G2:
Table of Contents

Advertisement

3-32 Compaq ProLiant ML350 Generation 2 Server Setup and Installation Guide
6. Raise the processor socket lever to open the socket
7. Place the processor into the socket
posts to align the processor.
CAUTION: Performing these steps in reverse order will cause the processor
socket on the system board to break.
1
Figure 3-29. Installing the processor and heatsink assembly
NOTE: The processor and sockets are keyed to fit one way only.
8. Lower the processor socket lever to secure the assembly in the socket, as
shown in Figure 3-30.
Figure 3-30. Securing the processor and heatsink assembly in the socket
.
. Use the processor socket guide
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant ml350 g2

Table of Contents