Performing An In-Place Upgrade On A Zenworks Secondary Server - Novell ZENWORKS LINUX MANAGEMENT 7.2 IR2 - INSTALLATION GUIDE 07-20-2009 Installation Manual

Hide thumbs Also See for ZENWORKS LINUX MANAGEMENT 7.2 IR2 - INSTALLATION GUIDE 07-20-2009:
Table of Contents

Advertisement

9 Enter the ZENworks administrator password.
The ZENworks services are restarted.
10 When prompted to create bundles that can be used to upgrade zlm clients (managed devices),
enter
If you choose to not create upgrade bundles at this time, you can execute the
command using the ZENworks 7.2 Linux Management Agent CD at a later time to create the
bundles.
11 Specify a folder that you want to create to hold the upgrade bundles.
12 After the upgrade completes, refer to /
to ensure that the upgrade is successful.
13 (Conditional) If you have ZENworks Secondary Servers to upgrade, continue with
an In-Place Upgrade on a ZENworks Secondary Server" on page
14 Continue with
IR1/IR1a" on page
12.1.2 Performing an In-Place Upgrade on a ZENworks
Secondary Server
You must upgrade the ZENworks Primary Server before upgrading ZENworks Secondary Servers.
For step-by-step information, see
Server" on page
1 Make sure the server meets the requirements. See
Requirements," on page
2 Apply the TID 3160279. For more information about applying the TID, see
(http://www.novell.com/support).
3 At the Linux server, mount the Novell ZENworks 7.2 Linux Management with Interim Release
1 CD by using the
For example,
mount device mountpoint
If you are using an ISO image rather than a physical CD, copy the ISO to a temporary folder on
the Linux server, then mount the image using the following command:
mount -o loop /tempfolderpath/isoimagename.iso mountpoint
Replace tempfolderpath with the path to the temporary folder and replace mountpoint with the
path to the file system location where you want to mount the image. The path specified by
mountpoint must already exist.
For example:
mount -o loop /zlm72/ZEN72_LinuxMgmt.iso /zlm72/install
4 Log in as
command:
./zlm-upgrade
5 When prompted to upgrade ZENworks Linux Management, enter
6 Review the Software License Agreement, pressing Page Down to scroll down the page, then
enter
96
Novell ZENworks 7.2 Linux Management Installation Guide
to continue.
Y
"Upgrading the Managed Device to ZENworks 7.2 Linux Management with
98.
"Performing an In-Place Upgrade on the ZENworks Primary
95.
25.
mount device mountpoint
mount /dev/cdrom /zlm72
, then start the upgrade program from the mount point by running the following
root
to accept the agreement.
Y
var/opt/novell/log/zenworks/zlm-upgrade.log
Section 2.1, "ZENworks Server
command.
.
zlm-upgrade -b
"Performing
96.
Novell Support
to continue.
Y

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zenworks linux management 7.2 ir2

Table of Contents