Schema 2
Each SPI Ground wire must be the same length as the Data wires per output, to
prevent timing issues.
Schema 3
Each SPI Ground wire must be the same length as the Data wires per output,
to prevent timing issues.
C4 Manual
d
ot
G
Version 1.0
23
Need help?
Do you have a question about the C4 and is the answer not in the manual?