Installation Preparations; Tools - Huawei UPS5000-H-800 kVA-NTN Quick Manual

Table of Contents

Advertisement

UPS5000-H-800 kVA-NTN
Quick Guide (480 V, 100 kVA Power Modules)
Configuration
800K: bottom cable routing, rear air
exhaust (three-phase three-wire)
800K: top cable routing, top air exhaust
(three-phase three-wire)

1.2 Installation Preparations

1.2.1 Tools

The onsite operation personnel can select tools based on the site requirements.
Personal protective equipment
Safety helmet
ESD gloves
Dust mask
Issue 01 (2023-03-20)
Dimensions (Unit: mm)
H
2200
2350
Goggles
Insulated gloves
Insulated shoes
Copyright © Huawei Technologies Co., Ltd.
1 Installation and Cable Connection
W
2800
2000
Protective shoes
Protective gloves
-
b
500
0
Reflective vest
Safety harness
-
3