Assembly Work - Beko DRYPOINT RA III 1080 Translation Of Original Installation And Operation Manual

Compressed air refrigeration dryer
Table of Contents

Advertisement

DRYPOINT
®
RA III
6.2

Assembly work

For assembly work to be carried out, the following protective equipment must be always worn and the
preparatory tasks must have been completed.
Tools
No tool necessary
Select and set up the place of installation according to the specifications in section "4.8
1.
Assembly conditions" on page 41.
The compressed air supply line, the condensate collection line, the cooling water line
2.
provided by the customer are pressureless and secured against unintentional pressure build
up.
3.
Have the necessary tools and materials ready.
4.
Prepare the required connection materials suitable for the pressure and temperature range.
5.
Check the product for damage, Only use the product in an undamaged state.
6.
The section "4.7 Connections" on page 39 was read and applied.
Align the product in such a way that the User Interface is easy visible and all connection
1.
elements are easy accessible.
2.
Fix the product to the floor, if necessary.
3.
Compressed air: connect the flanged connection to the compressed air line.
Cooling water, water-cooled models: connect the threaded connection to the cooling water
4.
line.
5.
Condensate drain: connect the condensate drain hose to the drain collection line.
6.
Install collision protection, if necessary.
Prerequisites
Material
No material necessary
Preparatory tasks
Assembly work
Original installa�on and opera�on manual
Protective equipment
47 | 120