5.2 Clearance Requirements
The following figure shows the minimum clearance requirements for installation
and O&M. The equipment clearances must also meet the site selection
requirements (see
Figure 5-1 Clearance requirements
5.3 Foundation Requirements
Figure 5-2 Foundation requirements
Requirements for foundation design solution:
●
Issue 03 (2023-03-30)
NO TICE
5.1 Site Selection
The ESS must be installed on concrete or other non-combustible surfaces.
Ensure that the installation surface is horizontal, secure, flat, and has
sufficient load-bearing capacity. Subsidence or slope is not allowed.