8.10 (Optional) Installing Maintenance Socket Cables

Figure 8-19 Connecting cables

8.11 Sealing Cable Holes

After cables are installed, seal the cable holes using the delivered sealing putty.
Figure 8-20 Sealing putty
Issue 03 (2023-03-30)
NO TE
The actual appearance of the maintenance socket may vary. The figure shows only the
installation method.