LUNA2000-200KWH-2H1 Smart String ESS
User Manual
Cable Label
107-1F1:2>TA1:2BAT+
108-1Q2:1>TA1:1BUS+
109-1Q1:4>TA1:2BAT-
111-1Q2:3>TA1:1BUS-
Step 3 Connect the preinstalled cables to J1 (left), J2 (right), and FE1.
Figure 8-7 Connecting cables
Step 4 Install the maintenance compartment cover and decorative cover of the rack
controller, and place the magnetic rings.
Figure 8-8 Installing covers
Issue 03 (2023-03-30)
NO TE
● When securing the network cable (shown by (6) in the figure), hold the cable and align
it with the FE network port. After the network cable is properly installed, do not release
it. Use the other hand to tighten the nut of the RJ45 connector.
● After the network cable is installed, gently pull it down to check that it is properly
installed.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Wiring Terminal
2BAT+
1BUS+
2BAT-
1BUS-
8 Installing Cables
107