Huawei LUNA2000-200KWH-2H1 User Manual page 88

Smart string ess
Hide thumbs Also See for LUNA2000-200KWH-2H1:
Table of Contents

Advertisement

LUNA2000-200KWH-2H1 Smart String ESS
User Manual
Step 5 Take out the delivered documents, such as the packing list.
Figure 7-5 Document position
Step 6 Take out the mounting kits delivered with the product.
Table 7-1 List of mounting kits
Hoisting conversion
bracket and screw
Step 7 After closing the cabinet doors, move the ESS to the specified position.
Issue 03 (2023-03-30)
NO TE
After opening the door, check the number of deliverables based on the packing list. If any
deliverable is missing, contact your dealer immediately.
NO TE
If a forklift cannot be used on the transport route (for example, there is a slope), use a
crane to move the ESS.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Anchor bracket, anchor bracket
screw, and expansion bolt
7 Installation
Leveling
spacer
79

Advertisement

Table of Contents
loading

This manual is also suitable for:

Luna2000-200kwh-100kw-2h1

Table of Contents