Installing Cables

Preparing Cables

5.1
The cable specifications must comply with local cable standards, especially the electrical
specifications and application environment. The key factors include the rated current, cable
type, routing method, maximum expected line loss, rated temperature, ambient temperature,
thermal resistance, acidity, sedimentation, and environmental protection requirements.
LUNA2000-2.0MWH-2HX
LUNA2000-2.0MWH-HE2HX
6 DC circuit breakers
LUNA2000-2.0MWH-2HX
3 DC circuit breakers