Sna Diagnostic Interface Verification; Async Terminal Connection - Paradyne COMSPHERE 3610 User Manual

Data service units
Hide thumbs Also See for COMSPHERE 3610:
Table of Contents

Advertisement

COMSPHERE 3600 Series Data Service Units
To install the hubbing device:
Procedure
1. Plug the 4-pin modular plug of the hubbing device
into the modular jack labeled CC/DC located on
the rear of the DSU.
NMS Network
Connection
To
NMS
CC IN/DC OUT
M6BJ
Cable
2. Plug one end of the 6-pin cable into the hubbing
device jack labeled CC IN/DC OUT.
3. Plug the opposite end of the M6BJ cable into the
appropriate 6700 or 6800 Series NMS jack.
Refer to your COMSPHERE 6700 or 6800 Series
NMS documentation to control and configure the DSU
from the NMS.
2-10
CC/DC
5
V . 3
/ D C
C C
U P
C K
B A
E
L I N
E R
W
P O
Hubbing
Device
496-14723-01
December 1996

SNA Diagnostic Interface Verification

Procedure
1. Enable the LPDA option (refer to Table 4-5).
2. Send a DSU/CSU and Line Status test from the
IBM NetView console to the control DSU and
each tributary.
3. As the status for each DSU is returned to NetView,
check the network address. If the address is
correct, the verification procedure is complete.
Refer to Appendix D, SNA Diagnostics, for
additional configuration information.

Async Terminal Connection

Use a CC-to-DB25 cable to connect an async terminal
to a DSU. This feature is available for the Model 3610
standalone unit only. To enable the async terminal, see
Appendix C, Async Terminal Operation.
Procedure
1. Plug the 4-pin modular plug of the DSU
CC-to-DB25 cable (feature number 3600-F3-504)
into the DSU jack labeled CC/DC.
Async Terminal
Connection
2. Connect the EIA-232 (DB25) end of the cable to
the async terminal. Tighten the holding screws.
CC/DC
5
V . 3
/ D C
C C
U P
C K
B A
E
L I N
E R
W
P O
Holding
Screws
To Async
Terminal
495-14577-02
3610-A2-GB46-60

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Comsphere 3611Comsphere 3600 series

Table of Contents