Turning On The System - GE Carestation 620 User's Reference Manual

Table of Contents

Advertisement

Carestation
620/650/650c (A1)

Turning on the system

CAUTION
3-4
1.
Plug the power cord into an electrical outlet. Make sure the
mains indicator light is on.
The mains indicator is lit when AC power is connected.
Battery is charging if it is not already fully charged.
1.
Mains indicator
2.
On/Standby switch
Figure 3-1 • Mains indicator and On/Standby switch
2.
Check that the breathing system is properly connected.
Do not turn on the system with the right-hand
(inspiratory) port plugged.
3.
Push the On/Standby switch for 1 second to turn on the system.
The Total flow indicator shows total fresh gas flow and the
display shows the power-up screen.
The system does a series of automated self tests.
In case of emergency, during power-up, O2 and agent delivery is
possible in bag mode.
4.
Perform a Full Test before the first case of the day.
5.
Perform a preoperative checkout before each case. See the
"Preoperative checkout" section.
Note
The system must perform a power-up self test after 12 hours of
remaining on. If the system has been on longer than 12 hours
without a power-up self test, the 'Turn power Off and On for self
tests' alarm occurs. Turn the power off and then back on between
cases to resolve the alarm.
1
2
2076152-001

Advertisement

Table of Contents
loading

Table of Contents