March 2022
7 Installation and Maintenance
Installation and configuration
Coil installation and configuration requires the services of your GE Service Representative. Please refer to
the service methods DVD.
For software revision 14.0 and later, the system will automatically identify the coil when connected.
Quality assurance
Quality Assurance testing should be performed upon receipt of the coil to establish a baseline of coil
performance. The testing should then be repeated at regular intervals.
Ask your GE Service Representative how to perform the Quality Assurance on your software level.
7.2.1 Tools required
Description
Cubicle Unified Phantom
Or 1.5T HD 8ch Wrist Array Phantom (only
included with 4535-302-1916*/ 3000-072-9275*)
Ambient operating conditions
Symbol
Measurement Type
Humidity
Temperature
Storage
7.4.1 Storage Location
Symbol
Measurement Type
Barometric pressure
Humidity
Temperature
GE Part #
Dunlee Part #
5342681
N/A
5160986-5
4535-302-14231
Operating Conditions
30 to 60% non-condensing
O
O
15-21
C (59 to 69.8
F)
Operating Conditions
500 -1060hPa
10 to 100% non-condensing
O
5-65
C
Page 27
Quantity
1
1